Former Teatro Comunale
LOCATION
Tuscany
Florence
PERIOD OF CONSTRUCTION
2020 - Ongoing
CLIENT
Savills Investment Management SGR SpA on behalf of the Future Living Fund
COST
46.000.000 €
THE SITE
The new square, the heart of the project, is accessible from Corso Italia, Via Magenta and Via Solferino. Disabled access and large spaces for events and concerts have been designed. On the same site three lots will be constructed for Commercial, Residential and Office use.
THE PROJECT
The project consisted in carrying out the structural works for the basement floors up to the level of the Square, all the structural works present above ground and all the external works of the Square. Specifically, three blocks will be built: block A, with 7 floors above ground, block B, with 8 floors above ground and block C, with 8 floors above ground, totaling more than 11,500 sqm. Buildings, ancillary and functional works serving the modernization of the museum.